Bilaspur Division became a Derailment Division

Bilaspur Division at 16:46  Hrs.

1. Type of Accident: Derailment 
2. Date & Time of accident : 30.04.2022, 16:00 Hrs.
3. Railway: SECR
4. Division: Bilaspur (BSP)
5. Block Section: Shahdol-Yard (SDL)
6. Big Section: Bilaspur-Shahdol  (BSP-SDL)
7. Location of Accident: Shahdol Yard at KM 910/47K
8. Electrified/Non-Electrified: Electrified
9. Single/Double/Triple/ Quadruple Line: BSP-PND (Double Line)
PND-NIQ (Triple Line)
NIQ-SDL (Double Line)
10. Train No.: BCN/CHH/SHG
11. Total Load: —
12. Brief: While Shunting from L. No. 10 to 09 – 03 Wagons derailed.
13. Suspected Casualty : NIL

Train No. BCN/HL/CHH/SHG While Shunting From L. N9. 10 to L No. 09   at SDL Yard 03 Wagons Rolled Down out of which one wagon Derailed towards KTE End. (90954/NCR).

Both trolley KTE End & Inside Trolley BSP End.

OHE Mast at KM 910/47 Affected.  Re-validation BPC work is in progress. 

Repc: No Traffic Movement Hampered Up Line Trains are running. Lower Panto & Raise Panto Dn Line Free for Traffic Movement.

BSP Divn SDL Yard Derailment

UPdate

PR Block Cancelled at 18.40 Hrs.
Re-Railment Work is in Progress till 21.45 Hrs.

Due to adjacent to Up M/L hence working cautiously.

In Bilaspur Division – Update

As per Message received from BSP Division at 12:35 hrs.

At BIJURI Station about thousand (Approx) people blocked UP & DN track blocked from 12:00 hrs resulted Train Movment hampred.

Demand: Restoration of Running of Coaching Trains.

RPF Staff Deployed: 31
Local Police: 110
GRP: 25

Goods Train movment:

Up Train:

N/PCMC detaining out side BJRI
N/KPRG now passing Darritola
BOBRN/SGTP detaining out side BJRI(From RO Siding)

Dn Train:

N BOX -791 detaining at BJRI
N/Box-802 detaining at BJRI

Coaching Train:

08749 (SDL-ABKP) left SDL RT at 12:30 hrs
BJRI Sch: 14:35-14:45 hrs
ABKP Sch: Arr: 17:35 hrs 

In R Divn: (Msg Recd at 18:40 Hrs)

Super Long Haul FOU/SAIT & PLMD + FOU/VNCW detaining between LAE-ANMD (Lakholi-Arang Mahanadi) Km-34/15 from 17.48 Hra due to Train Uncoupled of 2nd Part of FOU/VNCW, 5th & 6th Wagon from Engine.

Super Long Haul LAE (Lakholi) Through at 17:38 Hrs & 1st Part arrived  ANMD at 18.14 Hrs.

Repc: 18426 Exp deataining at Lakholi from 17:52 Hrs.

In R Divn: Update

Section Cleared at 21:45 Hrs with R/Loco affected Portion to LAE and Track given Fit.

Super Long Haul FOU/SAIT & PLMD + FOU/VNCW detaining between LAE-ANMD (Lakholi-Arang Mahanadi) Km-34/15 from 17.48 Hrs due to Train Uncoupled of 2nd Part of FOU/VNCW, 5th & 6th Wagon from Engine.

Derailment/SDL – update

18:18: Loco no. 27204 arrived at site
18:20- Eot
Up to 19:00: Try to pull and work stopped for clear obstruction, ART material loaded on hand trolley detaining for point not set till now by operating

19:30: Hand trolley with material arrived at site
19:35: Gap provided
19:40: Work started
20:20: BSP end trolley Rerailed
22:25: KTE end trolley Rerailed and re-railment completed.

рдбрд┐рд░реЗрд▓рдореЗрдВрдЯ.. рдбрд┐рд░реЗрд▓рдореЗрдВрдЯ.. рдбрд┐рд░реЗрд▓рдореЗрдВрдЯ.. рдЧреБрдбреНрд╕ рдЯреНрд░реЗрдиреЛрдВ рдХреЛ рднрдЧрд╛рдиреЗ рдХреЗ рдЪрдХреНрдХрд░ рдореЗрдВ рдХреЛрдЪрд┐рдВрдЧ рдЯреНрд░реЗрдиреЛрдВ рдЕрд░реНрдерд╛рдд рдпрд╛рддреНрд░реА рдЧрд╛рдбрд╝рд┐рдпреЛрдВ рдкрд░ рдХреЛрдИ рдзреНрдпрд╛рди рдирд╣реАрдВ рджрд┐рдпрд╛ рдЬрд╛ рд░рд╣рд╛ рд╣реИред

рд╕рднреА рдореЗрд▓/рдПрдХреНрд╕рдкреНрд░реЗрд╕ рдФрд░ рд╕рд╡рд╛рд░реА рдЧрд╛рдбрд╝рд┐рдпрд╛рдВ рд▓реЗрдЯ рдЪрд▓ рд░рд╣реА рд╣реИрдВ – рдкреВрд░реЗ-рдкреВрд░реЗ рдорд╣реАрдиреЗ рддрдХ! рдЕрдЧрд░ рджреЗрдЦрд╛ рдЬрд╛рдП рддреЛ рджрдХреНрд╖рд┐рдг рдкреВрд░реНрд╡ рдордзреНрдп рд░реЗрд▓рд╡реЗ – рдбрд┐рд░реЗрд▓рдореЗрдВрдЯ рд░реЗрд▓рд╡реЗ рдмрди рдЧрдИ рд╣реИред