Southern Railway: CBI books retired DyCE in construction of non-rquired ROBs

If the CBI can act or take self cognizance on the above type of loss of leakage of government revenue, then it should also act in the S&T department of railways where thousands of crores of loot from public exchequer on the purchase of the items like Axle Counters & non-Interlockings

Chennai: The Central Bureau of Investigation (CBI) has registered a case against a former Deputy Chief Engineer (DyCE) of the Southern Railway and others on charges of constructing four Road Over Bridges (ROBs) within a short stretch of 2 km without any public demand or justifiable vehicle utility.

The work pertains to the construction of the ROBs between Thiruthuraipoondi & Agasthiyampalli as part of the тВ╣506.72 crore gauge conversion project in which it was decided to eliminate manned/unmanned level crossings by replacing them with Limited Use Subway, Elevated Rail Road and ROB.

Acting on credible information, the Anti-Corruption Branch of CBI found that the four ROBs, the construction of which started in 2019 and were in different stages of completion now, were being built to replace four unmanned level crossings.

Though it was originally proposed to build Elevated Rail Road there, the then Deputy Chief Engineer D. Sarangapani recommended that it would be ideal to construct ROBs considering the soil conditions in the site.

Based on his recommendation, a tender was floated for the work valued at тВ╣34.80 crore and was awarded to M/s Rajkumar and Omega Constructions which was found to be the only eligible among six firms that participated in the process.

Investigators said that certain norms that had to be followed scrupulously in the decision leading to the construction of ROBs were flouted.

The CBIтАЩs First Information Report (FIR) said that there had to be a public demand for elimination of level crossings. Such decisions were taken on the basis of representations made by various groups, elected representatives, revenue authorities etc. Going by the decision of the Railway Board, the land required for construction of ROBs should be in the possession of the railways or otherwise it had to be on cost sharing basis with the State government.

The railway authorities should ascertain the feasibility by conducting a study of traffic flow that would justify the construction of a ROB. Where the volume of vehicular traffic was less, construction of Limited Use Subways or Elevated Rail Road which would cost much less should be explored.

In the construction of 4 ROBs, there was no public demand since there was no inhabitation on either side of the railway track. The 4 unmanned level crossings were proposed for conversion to manned crossings and not for construction of ROBs.

No feasibility study was conducted and the cost estimates were exceeded without the approval of the competent authority. There was no public transport plying in the route and the number of private vehicles was also very less, the FIR said.

“The local people have also been of the opinion that there was no requirement for the ROBs. The entire funding has been made by the Southern Railway. As on date тВ╣63.96 crore have been paid to the contractor which is in excess of the contract value of тВ╣38.97 crore. Thus, a huge loss has been caused to the Southern Railway”, the CBI said.

The then Deputy Chief Engineer and others were accused of violating the norms by not conducting technical study and Train Vehicle Unit survey to justify the construction.

No steps were taken for cost sharing with the State government which was mandatory for construction of ROBs. Tender proposal was initiated without the approval from the District Collector for elimination of level crossings.

The CBI accused Mr. Sarangapani, DyCE, now retired from service, and other unknown railway officials of abusing their official position by entering into a criminal conspiracy with unknown private persons in the flawed and unjustified proposal to cheat the Southern Railway by causing wrong loss.

Railway sources said that if the CBI can act on above type of loss of leakage of government revenue, then it should also act on S&T department of railways where the items like Axle Counter (MSDAC) & non-Interlocking are purchased on double-triple the price and thousands of crores loss happens to the railway and/or government exchequer.

Trend of EPC tenders in Indian Railways – Its losses to Railways, contractors, and the country at large

Minister for Railways, Ashwini Vaishnaw is requested to intervene & punish all Signalling officials who are purchasing/have purchased a product of 3 lakhs at 8 lakhs & more, causing тВ╣1500 crores loss of Govt exchequer. The Minister is also requested to hand over all the purchases of Axle Counters to the CBI and ED, so that this continuing scam can be halted.

Indian Railway: Contractors making Raining Profits by twisting the Policy in a cartelized manner!

#AxleCounter purchase is a very serious #SCAM of thousands of crores

рд░реЗрд▓рд╡реЗ рдХрд╛ ‘рдиреАрддрд┐рдЧрдд рднреНрд░рд╖реНрдЯрд╛рдЪрд╛рд░’ рд╣реБрдЖ рдЙрдЬрд╛рдЧрд░

PURCHASE OF MSDAC: SCAM HAS BEEN FURTHER EXPOSED!

Railway Signalling Scam: How has the railway justified the price difference of Rs. 1100 crores?

Trackless and corrupt system, and influence of contractors over the Stores department

рдИрд╕реАрдЖрд░ рдПрд╕рдПрд▓рдЯреА рд╕реНрдХреИрдо: рд╕рд┐рд░реНрдл рд╣рдВрдЧрд╛рдорд╛ рдЦреЬрд╛ рдХрд░рдирд╛ рдореЗрд░рд╛ рдордХрд╕рдж рдирд╣реАрдВ! рдореЗрд░реА рдХреЛрд╢рд┐рд╢ рд╣реИ рдХрд┐ рдпреЗ рд╕реВрд░рдд рдмрджрд▓рдиреА рдЪрд╛рд╣рд┐рдП!

#CBI #ROB #SLT #Scam #MSDAC #NonInterlocking #Construction #Corruption #Railway #IndianRailways #Works #Stores #Policycorruption #RailwayBoard #SouthernRailway