Kolkata : For South Eastern Railway’s infrastructural development and ongoing projects, and works, a gross amount of Rs.5401 crores including Extra Budgetary Resources (EBR) has been allotted in the Budget of 2020-21. South Eastern Railway is one of the leading Zonal Railway which contributes major share to Indian Railways’ earnings.
In the major Plan Head, the following amount has been allotted for the financial year 2020-21 through budget grant:
- For the Doubling Projects an amount of Rs.993.00 crores
-
For Level Crossings related to road safety an amount of Rs.42.86 crores
-
For Road Over Bridges & Road Under Bridges an amount of Rs.248.59 crores
-
For Track Renewal works an amount of Rs.840 crores
-
For Bridge Works an amount of Rs.33 crores
-
For Passenger Amenities an amount of Rs.151.83 crores
-
For Staff Welfare an amount of Rs.39.29 crores
Apart from the above, following “New Works” have been sanctioned for better connectivity and smooth operations in SER jurisdiction along with other ongoing developmental works.
- Kiriburu-Barbil (24.5 KM) New Line at an estimated cost of Rs.705.17 crores
-
Bhojudih-Talgoria (12.5 KM) Doubling at an estimated cost of Rs.129 crores
-
Muri-Barkakana (58 KM) Doubling at an estimated cost of Rs.580 crores
-
Rourkela-Bondamunda A Cabin 5th Line (10 KM) at an estimated cost of Rs.169.65 crores
Budgetary allotment of some major of the ongoing projects: (for the FY 2020-21)
Doubling:
Kharagpur-Adityapur, 3rd line – 132 KM, 310 crore
Kharagpur-Narayangarh, 3rd Line- 20 KM, 40 crore
Monohar-Bondamunda, 3rd Line – 30 KM, 35 crore
Rourkela-Jharsuguda, 3rd Line – 101 KM, 170 crore
Bondamunda-Ranchi, Doubling, 158.5 KM, 199.79 crore
Narayangarh-Bhadrak 3rd Line, 155 KM, 50 crore
Bondamunda-Rourkela, 4th Line, 9.3 KM, 23 crore
Dumetra-Link C Line – Connection with Bisra Station, 2.3 KM, 23 crore
Lodhma-Piska Link Line bypassing Hatia/Ranchi, 17.2 KM, 16 crore
Talgoria-Bokaro N Cabin Doubling, 38 KM, 51 crore
Purulia-Kotshila, Doubling, total 36 KM, 10 crore
Electrification:
Rupsa-Bangriposi – 89 KM, 20 crore
Bankura-Masagram – 118 KM, 30 crore
Tatanagar-Badampahar – 89 KM, 20 crore