CRS inspection of Lakadiya- Kidiyanagar Section of Palanpur- Samakhiali doubling Project on Western Railway
CRS/Western Circle, Mumbai will inspect Lakadiya-Kidiyanagar Section of Palanpur-Samakhiali doubling project on 17.09.2020 as per the following programme:
Following arrangements may be made for the above inspections:
1.┬аDRM/ADI:
i.┬аDRM/ADI is requested to form and move CRS Inspection Special as per the programme given above, keeping in view the requirement of main rear window of observation car for speed trial from Lakadiya (LKZ) to Kidiyanagar (KYG).
ii. DRM is also requested to accompany CRS for inspection along with concerned Branch Officers.
iii.┬а4 BG Motor Trolleys with Drivers and Trolley-men to be arranged on 17th September, 2020 at Kidiyanagar in time for Motor trolley inspection.
iv. Locomotives and rolling stock for speed trial should be in good condition and fit to run at 130 kmph. Both the speedometers of loco should be in working condition.
v.┬аNecessary communication between Loco and observation car should be arranged.
2.┬аDyCE/TM/CCG and SrDEN/Co/ADI: They are requested to arrange OMS-2000 along with competent staff as per inspection programme.
3. SrDEN/Co/ADI is also requested to arrange measurement team with necessary tools/equipment during inspection.
4.┬аOfficers as specified vide CRS/Western Circle Letter No. 16-/5/576 & 577/LD 208 dated 29/08/20 to accompany the CRS inspection.