Mission: Average Freight Train Speed to 50 Kmph
Freight Loading to 60,000 wagons per day
Freight Trains speed dated September 30, 2020: (In brackets, last year positions).
1. Freight Train speed (Kmph):
On date: 46.58 (23.9), +95%
For the month: 46.89 (24.08), +95%
Following ZRs (on date)>50 Kmph:
ER (63.64), WCR (52.69),
ZRs <45 Kmph:
SECR (39.68), SER (40.94),
NWR (44.69), CR(43.75).
On date: 4.14 (3.05), +36%
2. Loading (MT):
For the month: 102.13 (88.53), +15%
For the Year: 533.53 (586.33), -9%
For the month (wrtLY):
ZRs>10%: KR (+125), NR (+50), NER (+55), NWR (+48), CR (+28), SECR (+31), SER (+20), WCR (+23), ECOR (+11).
ZRs<last year: SR(-25), NFR(-13)
3 divisions BSB, LJN & TSK have not loaded any rake or wagon on date
Wagon/rake loaded (Nos):
On date: 66,664 Wagons
Outstanding registered demand- 10105 (Rakes)/5.11 Lakh Wagons
Port Traffic:
On date: 270 Rakes (174 loading+96 unloading)
Outstanding port demand (other than container): 786 Rakes (241 from +545 to)
3. Freight Revenue (Cr):
On date: 428.09 (309.09), +39%
For the month: 9896.86 (8716.29),+14%
For the Year: 50165.16 (60353.25),-17%
As circulated by Umesh Balonda, ED/E&R
#freight #trains #loading #railway #ir #rake #traffic #revenue