Mumbai Division, CRly achieved 100% Mail/Exp. and suburban punctuality
Mumbai Division has loaded 1477 wagons on 30.05.2021 which is close to the best ever loading of 1734 wagons on 26.05.2021
Central Railway, Mumbai Division performed well on 30.05.2021. Despite 5 hours mega block and other spread out blocks Mumbai division achieved 100% Mail/Express and Suburban punctuality on 30.05.2021.
On freight loading front Mumbai Division, Central Railway has loaded 1477 wagons on 30.05.2021 which is close to the best ever loading of 1734 wagons on 26.05.2021.
Mumbai Division has also achieved interchange of 113 rakes on 30.05.2021 which is close to best ever interchange of 118 rakes on 28.05.2021.
Pune Division achieved highest ever interchange of 99 trains on 30.05.2021. The previous best was 84.
Solapur Division has recorded best ever interchange of 134 trains on 30.05.2021. The previous best was 123.
Note: Interchange – Taking and handing over of goods trains at interchange station (last station of division).
#CentralRailway #GMCR #DRMBB